Volume XXXIX-B4
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XXXIX-B4, 375-378, 2012
https://doi.org/10.5194/isprsarchives-XXXIX-B4-375-2012
© Author(s) 2012. This work is distributed under
the Creative Commons Attribution 3.0 License.
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XXXIX-B4, 375-378, 2012
https://doi.org/10.5194/isprsarchives-XXXIX-B4-375-2012
© Author(s) 2012. This work is distributed under
the Creative Commons Attribution 3.0 License.

  31 Jul 2012

31 Jul 2012

AN UPDATING PRODUCTION LINE SYSTEM FOR NATIONAL TOPOGRAPHICAL DATABASE AT 1:50K OF CHINA BASED ON DIGITAL MAP GENERALIZATION

R. Zhao1, J. Chen1, D. Wang1, Y. Shang1, Z. Wang1, X. Li1, and T. Ai2 R. Zhao et al.
  • 1National Geomatics Center of China, 28 Lianhuachixilu, Haidian, Beijing, 100830, China
  • 2Wuhan University, Luojia Hill, Wuhan 430072, China

Keywords: Geospatial data updating, Digital map generalization, Rule, Multi scale, Production system

Abstract. This paper is focused on applying digital map generalization into the updating of geo-spatial database from large scale in the collaborative updating environment for SDI, an updating production line system for national topographical database at 1:50k of China is introduced. Based on the requirements analysis and review, we analyze the key factors for implementing updating geospatial data from large scale including technical and non-technical factors, followed by the general strategy of digital map generalization in practical production environment. In fact the most important factor is recognized that it is very difficult to establish generalization rules for production systems. We emphasized on this factor in our work and established a set of rules or constrains for scale topographical database updating 1:50k scaled data from 1:10k scaled data in a full digital environment mainly based on map specifications. Finally, the production line system structure is designed and the practical implementation is given.