Volume XLII-5/W2
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XLII-5/W2, 71–75, 2019
https://doi.org/10.5194/isprs-archives-XLII-5-W2-71-2019
© Author(s) 2019. This work is distributed under
the Creative Commons Attribution 4.0 License.
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XLII-5/W2, 71–75, 2019
https://doi.org/10.5194/isprs-archives-XLII-5-W2-71-2019
© Author(s) 2019. This work is distributed under
the Creative Commons Attribution 4.0 License.

  20 Sep 2019

20 Sep 2019

EXCHANGE INFORMATION ENHANCEMENT IN EXECUTION METHOD BY USING VIRTUAL REALITY

N. A. Q. Tran N. A. Q. Tran
  • Peter the Great Polytechnic University Saint Petersburg, 195251, Russia

Keywords: Virtual reality (VR), Building Information Model (BIM), execution method, off-site, 3D visualization, formwork model

Abstract. Applications based on virtual reality (VR) have hit the main stream nowadays. The latest innovations have been kept updating from film, game, automotive to any engineering industry and construction industry is no exception. There are many obvious key benefits gained by go through a completed building project or a construction site in 3D real-time environment which will help saving significant time and cost by the real work on site or reducing repetitive mistakes, errors in designing between disciplines/departments. Moreover, it can improve the exchanged information on site execution with the help of VR and building information model (BIM).