Volume XL-5/W7
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XL-5/W7, 283-288, 2015
https://doi.org/10.5194/isprsarchives-XL-5-W7-283-2015
© Author(s) 2015. This work is distributed under
the Creative Commons Attribution 3.0 License.
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XL-5/W7, 283-288, 2015
https://doi.org/10.5194/isprsarchives-XL-5-W7-283-2015
© Author(s) 2015. This work is distributed under
the Creative Commons Attribution 3.0 License.

  12 Aug 2015

12 Aug 2015

Coordination between Understanding Historic Buildings and BIM Modelling: A 3D-Output Oriented and typological Data Capture Method

K. Li1, S.J. Li1, Y. Liu2, W. Wang1, and C. Wu1 K. Li et al.
  • 1Institute Of Architectural History & Theory, Tianjin University, Tianjin, China
  • 2School of Computer Science and Technology,Tianjin University,Tianjin, China

Keywords: BIM, Structure-and-type Method, Structure tree, Type tree, Revit family manager

Abstract. At the present, in trend of shifting the old 2D-output oriented survey to a new 3D-output oriented survey based on BIM technology, the corresponding working methods and workflow for data capture, process, representation, etc. have to be changed.Based on case study of two buildings in the Summer Palace of Beijing, and Jiayuguan Pass at the west end of the Great Wall (both World Heritage sites), this paper puts forward a “structure-and-type method” by means of typological method used in archaeology, Revit family system, and the tectonic logic of building to realize a good coordination between understanding of historic buildings and BIM modelling.